Crusher Plant Financing and Leasing

The price of a crushing and screening plant is a single figure; what that plant costs the business depends on how it was funded. That is why the crusher plant financing and leasing question belongs in a separate conversation from machine selection. Buy the same plant for cash, on an investment loan, under a finance lease or through a documentary credit, and the timing of payment, the way it appears on the balance sheet and the size of the security given to the bank diverge sharply.
Comparing crusher plant financing and leasing routes
The points where the four routes differ are few and all measurable: when the cash leaves, what appears on the balance sheet, who holds title and which risk stays with you. Answering those four questions in one table moves the discussion away from haggling over an interest rate and toward the payment shape the operation can actually carry.
| Route | Timing of cash outflow | Balance sheet appearance | Ownership | Dominant risk |
|---|---|---|---|---|
| Cash purchase | Single payment before delivery | Fixed asset, no liability | With the business | Working capital exhausted |
| Investment loan | Down payment then instalments | Fixed asset and loan liability | With the business | Collateral and credit lines tied up |
| Finance lease | Low start, regular rentals | Right-of-use asset and lease liability | With the lessor until any purchase option | Term mismatched to machine life |
| Import under documentary credit | Tied to shipping conditions | Trade payable, convertible later | With the business after transfer | Bank facility blocked by the credit |
Cash purchase: the simplest route, sometimes the dearest
Paying cash carries no interest and gives the strongest position in negotiation. The true cost, however, is not the amount paid but the return that amount could have earned elsewhere. Once a crushing plant is commissioned, a queue of items follows: the spare parts stock, the first set of wear parts, the power connection, the site preparation and the working capital of the first months. When the whole machine price has left the account, the room for those items narrows; the plant gets built but reaching full capacity is delayed. Cash purchase is the right answer where the investment stays within a defined share of the cash reserve and the commissioning costs have been set aside separately.
Buying on a loan: title with you, security with the bank
An investment loan leaves ownership with the business and spreads payment across the production period. Two items pay for that: the interest burden and the collateral. Security is rarely limited to the machine itself; additional mortgage, guarantee or cash blockage may be required. That narrows the facility available for a later investment or a seasonal working capital need. The point to check in a loan appraisal is the fit between the instalment calendar and the production calendar. In a quarry that stands still during certain months of the year, a level instalment is still collected while production is stopped; unless cash for those months has been set aside in advance, the loan becomes a risk item in its own right.
Finance lease: a liability that is now visible
The advantage leasing was once sold on was keeping the obligation off the balance sheet. In current international financial reporting that distinction has disappeared for the lessee: apart from short-term leases and leases of low-value assets, the lessee recognises a right-of-use asset and a matching lease liability for virtually every lease. The income statement no longer shows a single rent expense but depreciation of the right-of-use asset plus interest on the lease liability, which shifts the expense toward the front end of the term. On the lessor's side, the split between finance and operating leases continues under the older tests of where risk and reward sit.
The practical consequence is direct: leasing is no longer a device that quietly improves gearing. If your existing loan agreements carry covenants tied to leverage ratios, a new lease will move those ratios and the lender should hear about it before signature. The genuine strength of a lease is the low initial outflow and a payment calendar fixed by contract; that economic substance, not the accounting appearance, is what the decision should rest on.
Matching the lease term to machine life
The most common mistake in leasing is choosing a term with no reference to the useful life of the machine. Set the term shorter than the life and payment ends while the plant is still productive, bringing a purchase option and an unplanned cash requirement forward. Set it longer and payment continues on a worn plant. Aligning the term with the plant's major overhaul interval avoids both outcomes.
Documentary credit: payment security, not asset finance
For imported machinery a letter of credit is the established instrument for balancing risk between buyer and seller: it guarantees that the seller will be paid once the shipping conditions are met. The common misreading is to treat it as long-term funding for the asset. It is a payment security tool, not financing of the asset itself. Opening a credit ties up your bank facility, and it stays tied up until delivery. Once the machine has arrived and the credit is settled, the bank may convert that obligation into a term loan or an equipment finance facility. The critical part is structuring that transition in advance: where the move from trade finance to long-term debt is unplanned, the cash squeeze lands exactly in the weeks when the plant is being commissioned and is not yet earning.
Three measures to decide on
The first measure is the cash outflow of the first twelve months. The second is the consumption of collateral and facility: after this investment, can the remaining headroom still cover the next seasonal need. The third is the overlap between the payment calendar and the production calendar. Read together with a cost per ton model, these three stop payback from being a guess. The other calculations gathered under investment and cost keep all three under one roof.
Because capacity and equipment arrangement set the financing burden directly, the configuration should be weighed alongside the available stationary crushing plant layouts; a plant specified larger than the market requires grows heavier under every one of the four routes.
Frequently asked questions
Why does a lease still affect my credit lines?
Because the lease liability sits on the liability side of the balance sheet and lifts leverage ratios. Where existing loans carry covenants tied to those ratios, the effect is felt immediately.
Can a machine bought under a credit be converted to a lease afterwards?
In practice the obligation can be turned into a term loan or an equipment facility once the credit is settled. That transition needs to be planned before the credit is opened, because negotiating position weakens afterwards.
Is cash purchase always the cheapest?
On interest alone, yes. Once the commissioning-period cash requirement is included, total cost can rise. A plant that reaches full capacity late gives back more in lost output than it saved in interest.
How long should a lease term be?
There is no single correct term; the reference is the plant's major overhaul interval. Aligning the contract with that interval prevents both an unexpected purchase option payment and paying rentals on a worn plant.
Definitions of technical terms: Glossary