Algeria Project: General 01 Mobile Crushing Plant on Site

August 5, 2026
General 01 Mobile Crusher in Algeria: 150 t/h Project

Challenge

A fast-moving plant crushing and screening 120-180 t/h was needed for quarry and infrastructure projects in Algeria.

Solution

General 01 mobile crusher: bypass grizzly feeder, mobile impact crusher for primary and secondary crushing, bolted vibrating screen, foldable conveyors.

Result

The plant was shipped to and commissioned in Algeria; hydraulic legs make it production-ready on site in 15 minutes.

Algeria has become the latest addition to our export projects in North Africa. The General 01 mobile crushing plant we sent for quarries and infrastructure work in the region has been commissioned on site. What sets it apart is that strong crushing performance is gathered on one platform, and relocating it is quick.

Primary and Secondary Crushing in the Same Machine

The plant can crush and screen 120-180 tonnes of material per hour. The bypass grizzly on the feeder separates soil-laden material before it reaches the crusher. Next, the mobile impact crusher completes both primary and secondary crushing in one machine with a high reduction ratio.

15-Minute Set-Up and Touchscreen Control

The heavy-duty mobile chassis, made from A1-grade steel, allows the plant to be hauled by a single truck tractor. Once on site, its hydraulic legs let it start production within 15 minutes. A bolted vibrating screen with high screening efficiency, folding mobile conveyors and a dust- and water-protected control panel with touchscreen keep operating costs to a minimum for our customer in Algeria.

Algeria General 01 Project – Questions and Answers

How much material does the plant process per hour?

It works with a crushing and screening capacity of 120-180 tonnes per hour.

How long does set-up on site take?

Thanks to its hydraulic legs, the plant is ready to produce on site in 15 minutes.

Which crusher does the plant use?

A mobile impact crusher that performs primary and secondary crushing in one machine.

How is the plant transported?

Its heavy-duty mobile chassis allows it to be moved easily with a single truck tractor.

What does the bypass grizzly feeder do?

It removes soil-laden material before it enters the crusher, raising efficiency and reducing crusher wear.

Related Content

General 01 Mobile Crushing & Screening Plant (GPS 1210)
Products

General 01 Mobile Crushing & Screening Plant (GPS 1210)

The General 01 mounts a GPS 1210 triple-pendulum impactor on a single wheeled chassis and performs primary and secondary crushing i…

General 01 and a Mobile Tertiary Crusher Working Together in Türkiye
Projects

General 01 and a Mobile Tertiary Crusher Working Together in Türkiye

In this project in Türkiye, a mobile tertiary crusher was added to the General 01 mobile crushing plant. Together the two units cru…

Niger Project: General 950 Mobile Crushing and Screening Plant in West Africa
Projects

Niger Project: General 950 Mobile Crushing and Screening Plant in West Africa

Delivered to Niger, the General 950 mobile crusher works at 160-240 tonnes per hour in this project. In the closed-circuit line wit…

GNR 640 in Türkiye: A Compact Mobile Crushing Plant for Hard Rock
Projects

GNR 640 in Türkiye: A Compact Mobile Crushing Plant for Hard Rock

The GNR 640 mobile crusher working in Türkiye crushes and screens 100 tonnes per hour in this project. In the closed-circuit line, …