We Completed the 7th International Libya Building and Construction Fair

At the 7th International Libya Building and Construction Fair held in Tripoli, the Prime Minister of Libya, Mr Abdulhamid DBEIBAH, visited our fair stand.

A visit at prime ministerial level shows where the fair stands on the country's agenda. Because reconstruction work in Libya is running road, housing and infrastructure projects at the same time, the supply of construction materials and machinery is a subject followed directly on the public side as well.
Aggregate demand comes from all three of those areas at once.
A road project calls for different fractions for the sub-base, the base and the wearing course, while concrete aggregate comes to the fore on the housing and infrastructure side. The number of fractions a single line can deliver is determined by the number of screen decks, so crusher capacity and screen area are sized together during installation.
At our stand we presented our crushing plants and concrete batching plants; a stationary crushing plant was discussed for sites with long-life reserves, and mobile lines for operations that change location.
Definitions of technical terms: Glossary




